Buy and Hold Real Estate Case Study – 62nd St – Kansas City

62nd St, like many of our homes, was full rehab secured on from our direct distressed channel network. The property had a half finished basement with water and foundation issues, the roof and all windows were in disrepair and had to be replaced. We provided refinished wood floors, closed door way to create a new bedroom […]

Kansas City KS Real Estate Buy and Hold Case Study 74th St

This Kansas City KS Real Estate project at 74th St was a MLS short sale home which was a DIY weekend warrior updated home.   Were were able to retain windows and roof, but had opted to do a full paint, new flooring, add tile in bathroom and add a shower to the master bath. […]

Fix and Flip Kansas City Real Estate Case Study: Arroyo Project, Olathe KS

Arroyo was an Olathe fix and flip rehab in the Fall of 2015.  New roof, full paint inside and out.  Added granite in kitchens and all baths, all new fixtures and outlets.  Unfinished basement we white box finished along with the garage.  ​  Olathe Real Estate Fix & Flip Challenges Biggest Challenge: Driveway had a […]

Kansas City Home Investment Buy and Hold: 80th St Project – KCK

80th St Project was another Kansas City Home Investment “buy and hold” property that needed a lot of attention but acquisition costs were higher than our normal costs for the time which lent itself to a great buy and hold project. New roof, new paint in and out, new flooring, new kitchen cabinets and epoxy […]

Kansas City Fix and Flip House: Cleveland Project Kansas City KS

Cleveland was a home that we observed to go on and off market 3 different times as it was secured by investors only to fall through for various reasons related to the scope of work required prior to coming to us. A lot of interior work was required – new interior paint, new kitchen cabinets, counters, […]

Shawnee KS Fix and Flip: Noreston Project

Noreston was a HUD purchase in the Winter of 2015.  The home was lightly lived in and simply needed attention to update and re-detail the home.  The only piece of the home that was not original to the 1989 build was the basement carpet. Shawnee KS Fix and Flip: Noreston Project Challenges Biggest Challenges:  Working […]